Who we serve
You hold powered land

What your connection is actually worth.

You run an industrial business, a mining operation, a development company or a utility, and you hold a powered site that has never run compute. That grid connection is the scarce input of the AI buildout. What it is worth depends on what it can actually deliver, and on a date.

Where you stand

Where you stand.

New grid connections at industrial scale take years of studies and approvals. Yours already exists. In a market where power is the binding constraint on new AI capacity, that connection, not the land or the building, is the asset.

What the site earns depends on what stands on it. As an industrial load it earns its current margin. As the home of a contracted AI tenant it earns data-center economics, financed against the tenant's covenant rather than your balance sheet.

The path

The path.

Four moves, in a fixed order.

01

What the power actually is

Firm megawatts against nameplate, who controls the connection, what the permits and the state allow, assessed before you spend real money. If the site cannot carry a build, you hear it from us first.

02

What a buyer will ask

Nothing gets financed before a creditworthy tenant signs, so the site has to answer their committee first. We know those questions and the order they arrive in. The signing is between you and them.

03

What a lender funds against

Debt at this scale is raised against contracted revenue rather than against your company. That shapes the offtake terms, and it is worth knowing before you negotiate them, not after.

04

Handoff

A buildable project, and then we are out. The retrofit, the equipment and the operating business go to the firms that do those things.

What we do

What we do.

  • A straight read on the power: what the connection delivers against nameplate, who controls it, and whether the permits and the state still allow what you assume they do.
  • The questions a buyer will ask, answered first: we know the order they arrive in, because we came from that side of the table.
  • A path to a date: where the grid is slow, on-site generation and storage scoped with the specialists who build them, so the megawatts carry a date a lender can underwrite.
  • A route to the people who buy: hyperscalers, AI labs and neoclouds, and what each of them needs a site to answer before they will sign.
  • An end point: a buildable project, handed to whoever builds it, with our name still on the site.

See the work in detail

YOUR SITE · QUALIFIED · BANKABLE
If you are already mining

A live load, and what it proves.

A mining facility is the shortest version of this case: the connection exists, it is energized, and it is drawing at scale today. Four things change when the buyer is a tenant rather than a pool.

01

Firm, not just live

A running load demonstrates draw. It does not establish what is deliverable around the clock, at what cost, in the form a tenant's diligence expects. That is a different question and it is the one that gets asked first.

02

What the conversion costs

Your electrical backbone largely carries over. The thermal plant mostly does not. That work belongs to an EPC, and knowing the number early is what stops it surfacing during somebody else's diligence.

03

A covenant instead of a block reward

A creditworthy tenant on take-or-pay terms turns the site's revenue into contracted cash flow a lender will finance against. That is the change that re-rates the asset.

04

A sequence that keeps you earning

Staged so mining revenue carries the site as long as it usefully can, rather than stopping on the day a term sheet is signed.

The evidence

Recent conversions.

1,884 MW
already in place at a retired coal site now being rebuilt as an AI campus, with no new line built.
$10B+
committed to turn that one powered shell into a live AI data-center campus.
480 MW
of energized interconnection at a shut aluminum smelter, acquired for the connection it left behind.

The interconnection took years to get. That is the part the market is short of.

Start with the power.

Tell us the building and the megawatts. We'll come back with a straight first read, before you commit a dollar.

Start a conversation