Scale Datacenters · Oklahoma City, Oklahoma County, Oklahoma
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
Scale Datacenters. Triple redundant power retained from the 2013 Chesapeake corporate build; Level 3+ facility, tornado and seismically shielded; operator states the 10 MW load is served behind the meter on the former campus (council testimony) reported
OG&E territory (SPP). Host utility territory; no utility interconnection story is publicly confirmed reported
Scale Datacenters. Retrofit of an 82,000 sq ft corporate data center (built ~2013 for Chesapeake Energy, previously listed at 2.9 MW IT) to a 10 MW AI facility; closed-loop direct-to-chip liquid cooling; renewable matching claimed
Cerebras CS-3. 300+ wafer-scale CS-3 systems (WSE-3: 4 trillion transistors, 900,000 AI cores each), 44+ exaflops aggregate
Cerebras Inference Cloud. Dedicated inference serving (Llama, GPT-OSS, Qwen, DeepSeek) at 2,000 to 3,000 tokens per second
Neocloud Group is the advisory firm AI companies bring in to secure data center capacity. The Registry is part of that work.
Tell us the megawatts and the date. Within one business day, a first read on which operators and sites in Oklahoma can take you. Hold a powered site there yourself? Tell us about it.