Scale Datacenter Oklahoma City

Scale Datacenters · Oklahoma City, Oklahoma County, Oklahoma

Verified by Neocloud GroupChecked against 5 sources, including primary filings and releases
Open on the map →
Undisclosed
Capacity not yet disclosed
10 MW
Energized today
2025-09
First power
SPP
Grid region · location approximate
In brief

What makes it notable.

  1. A conversion of an 82,000 square foot corporate data center, built around 2013 and previously listed at 2.9 MW of IT, into a 10 MW AI facility with closed-loop direct-to-chip liquid cooling.
  2. The operator states the 10 MW load is served behind the meter on the former campus, which retains triple redundant power and a Level 3+ design shielded against tornadoes and seismic events.
  3. The first building was fully deployed in September 2025 with more than 300 wafer-scale CS-3 systems, 44-plus exaflops aggregate, serving dedicated inference.
Deal anatomy

Six layers, and who holds each.

Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.

Power
Scale Datacenters, OG&E territory (SPP)
Site and build
Scale Datacenters
Compute
Cerebras CS-3
Cloud operator
Cerebras Inference Cloud
Anchor tenant
Members
Capital
Members
Free for professionals in AI infrastructure.
Timeline

From here to full build.

  1. 2025-09First power
  2. 2025-09Full buildoutfirst building fully deployed
  3. Oct 2026Today
The detail

Each party's role.

Power

Scale Datacenters. Triple redundant power retained from the 2013 Chesapeake corporate build; Level 3+ facility, tornado and seismically shielded; operator states the 10 MW load is served behind the meter on the former campus (council testimony) reported

Power

OG&E territory (SPP). Host utility territory; no utility interconnection story is publicly confirmed reported

Site and build

Scale Datacenters. Retrofit of an 82,000 sq ft corporate data center (built ~2013 for Chesapeake Energy, previously listed at 2.9 MW IT) to a 10 MW AI facility; closed-loop direct-to-chip liquid cooling; renewable matching claimed

Compute

Cerebras CS-3. 300+ wafer-scale CS-3 systems (WSE-3: 4 trillion transistors, 900,000 AI cores each), 44+ exaflops aggregate

Cloud operator

Cerebras Inference Cloud. Dedicated inference serving (Llama, GPT-OSS, Qwen, DeepSeek) at 2,000 to 3,000 tokens per second

Related sites

Nearby in the buildout.

Sources

The record behind this page.

Neocloud Group

Who keeps this record.

Neocloud Group is the advisory firm AI companies bring in to secure data center capacity. The Registry is part of that work.

Need capacity in Oklahoma?

Tell us the megawatts and the date. Within one business day, a first read on which operators and sites in Oklahoma can take you. Hold a powered site there yourself? Tell us about it.

Start a conversation →