What we do

Colocation, campuses, AI tenants and powered sites.

Capacity secured for AI companies, from a hall to a full campus. AI tenants placed with operators and powered sites. And the problems that stall either side, worked until the servers are live.

Problem-solving

Where deals stall, and what moves them.

Power that isn't firm

Nameplate quoted as firm, or an interconnection that is still in study.

What moves itThe read taken from the utility's study stage and the signed agreements, then price and date reset to what's real. On-site generation where the gap is short enough to bridge.

A date that slips

Most slips trace back to energization: a utility delay, a late transformer or switchgear.

What moves itBefore signing, late credits and a walk-away right in the lease. After, delivery phased from whatever is energized first, or interim space elsewhere.

A commitment larger than the signer

A new subsidiary, a project vehicle, or a balance sheet the operator's own lender won't count.

What moves itThe right entity on the contract, a guarantee from a parent or investor, security that steps down as the bills get paid, or a first phase the credit team can sign off.

A site that fails diligence

Zoning, water, title, or an offtake a lender won't fund against.

What moves itEach gap named and priced. Fixed if it can be, dropped before more money goes in if it can't.

Services.

Tell us where it stands.

What you need, what you hold, or where it's stuck: the megawatts, the market and the date. A first read comes back within one business day, and nothing is shared without your written consent.

Start a conversation →