The Buildout Registry · Louisiana

Delta Forge 1

Applied Digital · Alexandria, Rapides Parish County, Louisiana

Verified by Neocloud GroupChecked against 5 sources, including primary filings and releases
Open on the map →
300 MW
Critical IT planned
0 MW
Energized today
2027
First power
MISO
Grid region · location approximate
In brief

What makes it notable.

  1. A greenfield build of two 150 MW buildings with closed-loop liquid cooling, giving 300 MW critical IT and 430 MW gross planned on a 672-acre parish allocation.
  2. Cleco serves the full campus load on MISO, with Applied Digital reimbursing all infrastructure and generation costs under Louisiana PSC oversight.
  3. Site work began in January 2026 and initial operations are targeted for mid-2027, with parish filings showing the first 300 acres built in four phases.
Deal anatomy

Six layers, and who holds each.

Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.

Power
Cleco
Site and build
Applied Digital (self-build)
Compute
Not disclosed
Cloud operator
Applied Digital
Anchor tenant
Members
Capital
Members
Free for professionals in AI infrastructure.
Timeline

From here to full build.

  1. Oct 2026Today
  2. 2027First powerinitial operations, mid-year
  3. not disclosedFull buildoutinitial 300 acres built in four phases per parish filings
The detail

Each party's role.

Power

Cleco. Regulated MISO utility serving the full campus load; Applied Digital reimburses all infrastructure and generation costs with assurances against cost-shifting to other customers, under Louisiana PSC oversight

Site and build

Applied Digital (self-build). Greenfield build: two 150 MW buildings with closed-loop liquid cooling on a 672-acre parish allocation; site work began January 2026 reported

Compute

Not disclosed. Tenant hardware not announced; purpose-built for AI training and inference workloads inferred

Cloud operator

Applied Digital. Builds, owns and operates the campus under the long-term hyperscaler lease (AI Factory model)

Related sites

Nearby in the buildout.

Sources

The record behind this page.

Neocloud Group

Who keeps this record.

Neocloud Group is the advisory firm AI companies bring in to secure data center capacity. The Registry is part of that work.

Need capacity in Louisiana?

Tell us the megawatts and the date. Within one business day, a first read on which operators and sites in Louisiana can take you. Hold a powered site there yourself? Tell us about it.

Start a conversation →