The Buildout Registry · North Dakota

Polaris Forge 2

Applied Digital · Harwood, Cass County, North Dakota

Verified by Neocloud GroupChecked against 4 sources, including primary filings and releases
Open on the map →
200 MW
Critical IT planned
0 MW
Energized today
2026-H2
First power
MISO
Grid region · location approximate
In brief

What makes it notable.

  1. A 1 GW planned gross campus in Harwood, North Dakota, served by Cass County Electric Cooperative with Minnkota Power Cooperative as wholesale supplier on the MISO grid.
  2. Ground broke in September 2025, with first power targeted for the second half of 2026 and full buildout in 2027. Planned critical capacity is 200 MW.
  3. Applied Digital develops the campus with proprietary closed-loop liquid cooling, near-zero water use and a projected PUE of 1.18, against 200 MW of planned critical capacity.
Deal anatomy

Six layers, and who holds each.

Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.

Power
Cass County Electric Cooperative, Minnkota Power Cooperative
Site and build
Applied Digital
Compute
Tenant-supplied GPU/accelerators
Cloud operator
Tenant-operated
Anchor tenant
Members
Capital
Members
Free for professionals in AI infrastructure.
Timeline

From here to full build.

  1. 2026-H2First power
  2. Oct 2026Today
  3. 2027Full buildout
The detail

Each party's role.

Power

Cass County Electric Cooperative. Local distribution cooperative delivering power to the campus

Power

Minnkota Power Cooperative. Wholesale generation and transmission supplier on the MISO grid

Site and build

Applied Digital. Owner-developer; proprietary closed-loop liquid cooling, near-zero water, projected PUE 1.18

Compute

Tenant-supplied GPU/accelerators. Developer-landlord shell; the hyperscaler tenant provisions its own compute, not disclosed by Applied Digital inferred

Cloud operator

Tenant-operated. The hyperscaler tenant runs its own orchestration/software stack on the leased campus inferred

Related sites

Nearby in the buildout.

Sources

The record behind this page.

Neocloud Group

Who keeps this record.

Neocloud Group is the advisory firm AI companies bring in to secure data center capacity. The Registry is part of that work.

Need capacity in North Dakota?

Tell us the megawatts and the date. Within one business day, a first read on which operators and sites in North Dakota can take you. Hold a powered site there yourself? Tell us about it.