Core Scientific · Marble, Cherokee County, North Carolina
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
Duke Energy. Electric utility, 82 MW of gross utility capacity (the majority feed)
Murphy Electric Power Board (TVA). Local power company distributing TVA wholesale power, 35 MW of gross utility capacity
Core Scientific (in-house). Crypto-to-HPC conversion of the former American Thread plant (closed 2015; 70 acres, 250k sq ft; mining from 2018); cooling design not disclosed reported
NVIDIA. CoreWeave GPU fleet hosted at the site (models not disclosed) reported
Not disclosed. Tenant-controlled inferred
Neocloud Group is the advisory firm AI companies bring in to secure data center capacity. The Registry is part of that work.
Tell us the megawatts and the date. Within one business day, a first read on which operators and sites in North Carolina can take you. Hold a powered site there yourself? Tell us about it.
Start a conversation →