Core Scientific · Wieland, Hunt County, Texas
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
Farmers Electric Cooperative (FEC). Counterparty to the electric service agreement supporting ~430 MW of gross utility capacity, with an approved ERCOT interconnection ramp schedule in hand at acquisition; the 10-Q names only "a related electric service agreement" reported
ERCOT. Independent system operator; an approved interconnection ramp schedule came with the acquisition. The planned 431 MW is conditionally approved in Batch Zero as Base Load, Advancing Large Load, Pathway (e): interconnection studies complete, the 431 MW stability study approved, collateral posted
Core Scientific (in-house development). Greenfield, no retrofit; self-performs development and construction at a stated ~$11-12M/MW. Long-lead equipment ordered and construction commenced (Sep 2026 filing). No EPC or general contractor is named in any source.
Wier & Associates, Inc.. Boundary surveyor of record for the ~260-acre tract (WA# 22141), named in the purchase agreement
AMD Instinct GPUs / EPYC CPUs. Silicon named at partnership level; not assigned to Hunt by any source inferred
Core Scientific. Operator of the campus under its colocation model
Neocloud Group is the advisory firm AI companies bring in to secure data center capacity. The Registry is part of that work.
Tell us the megawatts and the date. Within one business day, a first read on which operators and sites in Texas can take you. Hold a powered site there yourself? Tell us about it.
Start a conversation →