The Buildout Registry · Texas

Core Scientific Hunt County Campus

Core Scientific · Wieland, Hunt County, Texas

Verified by Neocloud GroupChecked against 5 sources, including primary filings and releases
Open on the map →
285 MW
Critical IT planned
0 MW
Energized today
Under construction
Stage
ERCOT
Grid region · location approximate
In brief

What makes it notable.

  1. A greenfield build on about 260 acres near Greenville, Texas, with no retrofit. Core Scientific self-performs development and construction at a stated roughly $11 to $12 million per MW.
  2. The planned 431 MW is conditionally approved by ERCOT in Batch Zero as Base Load, Advancing Large Load, with interconnection studies complete and the stability study approved.
  3. Farmers Electric Cooperative is the counterparty to the electric service agreement. Long-lead equipment is ordered and construction commenced, per a September 2026 filing, and 285 MW critical is planned.
Deal anatomy

Six layers, and who holds each.

Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.

Power
Farmers Electric Cooperative (FEC), ERCOT
Site and build
Core Scientific (in-house development), Wier & Associates, Inc.
Compute
AMD Instinct GPUs / EPYC CPUs
Cloud operator
Core Scientific
Anchor tenant
Members
Capital
Members
Free for professionals in AI infrastructure.
The detail

Each party's role.

Power

Farmers Electric Cooperative (FEC). Counterparty to the electric service agreement supporting ~430 MW of gross utility capacity, with an approved ERCOT interconnection ramp schedule in hand at acquisition; the 10-Q names only "a related electric service agreement" reported

Power

ERCOT. Independent system operator; an approved interconnection ramp schedule came with the acquisition. The planned 431 MW is conditionally approved in Batch Zero as Base Load, Advancing Large Load, Pathway (e): interconnection studies complete, the 431 MW stability study approved, collateral posted

Site and build

Core Scientific (in-house development). Greenfield, no retrofit; self-performs development and construction at a stated ~$11-12M/MW. Long-lead equipment ordered and construction commenced (Sep 2026 filing). No EPC or general contractor is named in any source.

Site and build

Wier & Associates, Inc.. Boundary surveyor of record for the ~260-acre tract (WA# 22141), named in the purchase agreement

Compute

AMD Instinct GPUs / EPYC CPUs. Silicon named at partnership level; not assigned to Hunt by any source inferred

Cloud operator

Core Scientific. Operator of the campus under its colocation model

Related sites

Nearby in the buildout.

Sources

The record behind this page.

Neocloud Group

Who keeps this record.

Neocloud Group is the advisory firm AI companies bring in to secure data center capacity. The Registry is part of that work.

Need capacity in Texas?

Tell us the megawatts and the date. Within one business day, a first read on which operators and sites in Texas can take you. Hold a powered site there yourself? Tell us about it.

Start a conversation →