The Buildout Registry · Missouri

Lambda Kansas City AI Factory

Lambda · Kansas City, Platte County, Missouri

Verified by Neocloud GroupChecked against 3 sources, including primary filings and releases
Open on the map →
100 MW
Critical IT planned
0 MW
Energized today
2026
First power
SPP
Grid region · location approximate
In brief

What makes it notable.

  1. A 100 MW AI factory in a 259,110 square foot, 2009-era powered shell on 16.9 acres in Kansas City's Northland, with 100-plus MW of potential and future phases under evaluation.
  2. Evergy supplies electric power on SPP and Spire is a named gas utility partner, alongside local engineering and electrical firms.
  3. The launch deployment is more than 10,000 NVIDIA Blackwell Ultra GPUs, with the footprint expected to double. Energization in 2026 is announced but unconfirmed.
Deal anatomy

Six layers, and who holds each.

Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.

Power
Evergy, Spire
Site and build
Russell Henderson Engineers / U.S. Engineering / Capital Electric
Compute
NVIDIA Blackwell Ultra
Cloud operator
Lambda
Anchor tenant
Members
Capital
Members
Free for professionals in AI infrastructure.
Timeline

From here to full build.

  1. 2026First powerannounced early 2026; energization unconfirmed
  2. Oct 2026Today
  3. not disclosedFull buildout100+ MW potential; future phases under evaluation
The detail

Each party's role.

Power

Evergy. Electric utility (SPP; named project partner in Lambda's announcement)

Power

Spire. Natural gas utility (named project partner) reported

Site and build

Russell Henderson Engineers / U.S. Engineering / Capital Electric. Local engineering and electrical firms named as project partners; 259,110 sq ft, 16.9 acres, 2009-era powered shell reported

Compute

NVIDIA Blackwell Ultra. 10,000+ GPUs at launch, footprint expected to double

Cloud operator

Lambda. Operates its own AI cloud stack on-site inferred

Related sites

Nearby in the buildout.

Sources

The record behind this page.

Neocloud Group

Who keeps this record.

Neocloud Group is the advisory firm AI companies bring in to secure data center capacity. The Registry is part of that work.

Need capacity in Missouri?

Tell us the megawatts and the date. Within one business day, a first read on which operators and sites in Missouri can take you. Hold a powered site there yourself? Tell us about it.

Start a conversation →