The Buildout Registry · Missouri

Patmos AI Campus

Patmos · Kansas City, Jackson County, Missouri

Verified by Neocloud GroupChecked against 3 sources, including primary filings and releases
Open on the map →
Undisclosed
Capacity not yet disclosed
12 MW
Energized today
2024
First power
SPP
Grid region · location approximate
In brief

What makes it notable.

  1. A retrofit of the former Kansas City Star press building into an AI campus, live since 2024 with 12 MW gross deployed today.
  2. GPUs on site are NVIDIA hardware, and the campus is planned to reach 35 MW with full buildout in 2026.
Deal anatomy

Six layers, and who holds each.

Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.

Power
Evergy
Site and build
Patmos
Compute
NVIDIA
Cloud operator
Nebius
Anchor tenant
Members
Capital
Members
Free for professionals in AI infrastructure.
Timeline

From here to full build.

  1. 2024First power
  2. 2026Full buildout
  3. Oct 2026Today
The detail

Each party's role.

Power

Evergy. Local electric utility (SPP) inferred

Site and build

Patmos. Retrofit of the former KC Star press building

Compute

NVIDIA. GPUs deployed by tenant Nebius reported

Cloud operator

Nebius. AI-native cloud platform on-site reported

Related sites

Nearby in the buildout.

Sources

The record behind this page.

Neocloud Group

Who keeps this record.

Neocloud Group is the advisory firm AI companies bring in to secure data center capacity. The Registry is part of that work.

Need capacity in Missouri?

Tell us the megawatts and the date. Within one business day, a first read on which operators and sites in Missouri can take you. Hold a powered site there yourself? Tell us about it.

Start a conversation →