The Buildout Registry · Michigan

Stargate Saline Township

Related Digital · Saline Township, Washtenaw County, Michigan

Verified by Neocloud GroupChecked against 5 sources, including primary filings and releases
Open on the map →
1,383 MW
Gross planned
0 MW
Energized today
2027-Q1
First power
MISO
Grid region · location approximate
In brief

What makes it notable.

  1. DTE Energy supplies 1,383 MW from the grid under a roughly 19-year agreement approved by the Michigan PSC, paired with about 1,400 MW of DTE-owned storage on a 15-year term.
  2. Three single-story buildings of 550,000 square feet each on 250 acres, built by Walbridge with roughly 2,500 union construction jobs under a project labor agreement.
  3. First buildings are reported operational in the first quarter of 2027, with full buildout by the end of 2027.
Deal anatomy

Six layers, and who holds each.

Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.

Power
DTE Energy, DTE Energy (storage)
Site and build
Walbridge
Compute
Undisclosed (Oracle-procured)
Cloud operator
Oracle (Green Chile Ventures LLC)
Anchor tenant
Members
Capital
Members
Free for professionals in AI infrastructure.
Timeline

From here to full build.

  1. Oct 2026Today
  2. 2027-Q1First powerfirst buildings operational, reported
  3. 2027Full buildoutend of year, reported
The detail

Each party's role.

Power

DTE Energy. 1,383 MW supply agreement (~19-yr), 100% grid; MI PSC-approved (U-21990)

Power

DTE Energy (storage). ~1,400 MW DTE-owned storage (15-yr); costs paid by Oracle (Green Chile Ventures)

Site and build

Walbridge. General contractor; three 550,000 sq ft single-story buildings on a 250-acre campus, roughly 2,500 union construction jobs under a project labor agreement

Compute

Undisclosed (Oracle-procured). Undisclosed; NVIDIA likely (Stargate/Oracle pattern) inferred

Cloud operator

Oracle (Green Chile Ventures LLC). Named in the MPSC filing as the entity that plans to build and operate the data center

Related sites

Nearby in the buildout.

Sources

The record behind this page.

Neocloud Group

Who keeps this record.

Neocloud Group is the advisory firm AI companies bring in to secure data center capacity. The Registry is part of that work.