Prime Data Centers · Avondale, Maricopa County, Arizona
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
Salt River Project (SRP). Serving electric utility; power is delivered through a dedicated on-site 250 MW substation whose Phase 1 is commissioned. SRP is a political subdivision and is not ACC-regulated, so the absence of an ACC docket is expected. reported
ARCOMurray. General contractor executing the build. Greenfield new construction, not a conversion.
Not disclosed. No chip or GPU vendor is named for PHX01 in any source inferred
Prime Data Centers. Owns and operates the campus; closed-loop air and liquid cooling, concurrently maintainable M&E
Neocloud Group is the advisory firm AI companies bring in to secure data center capacity. The Registry is part of that work.
Tell us the megawatts and the date. Within one business day, a first read on which operators and sites in Arizona can take you. Hold a powered site there yourself? Tell us about it.
Start a conversation →