Fleet Data Centers · Tahoe Reno Industrial Center, Storey County, Nevada
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
NV Energy. Utility; permanent service expected in 2 to 3 years; dedicated on-site substation within the bond-financed project reported
South Valley temporary gas plant. 144 MW temporary natural gas plant to bridge interconnection; PUCN application filed 2026-04-20 reported
Fleet Data Centers (build-to-suit). Greenfield on 252 acres; dual two-story buildings under construction since May 2026; GC not named reported
Not disclosed. Tenant-controlled inferred
Not disclosed. Tenant-controlled inferred
Neocloud Group is the advisory firm AI companies bring in to secure data center capacity. The Registry is part of that work.
Tell us the megawatts and the date. Within one business day, a first read on which operators and sites in Nevada can take you. Hold a powered site there yourself? Tell us about it.