The Buildout Registry · Wisconsin

Lighthouse (Stargate Wisconsin)

Vantage Data Centers · Port Washington, Ozaukee County, Wisconsin

Verified by Neocloud GroupChecked against 5 sources, including primary filings and releases
Open on the map →
902 MW
Critical IT planned
0 MW
Energized today
2027
First power
MISO
Grid region · location approximate
In brief

What makes it notable.

  1. Four single-story data centers of about 2.5 million square feet on a 672-acre campus, planned for 902 MW of critical IT with closed-loop liquid cooling and minimal water use.
  2. We Energies serves the site under a dedicated rate with Vantage underwriting all power infrastructure, as nearly 2 GW of new generation is added. A 1.3 GW grid connection is targeted by end of 2027.
  3. Cloverleaf Infrastructure assembled the roughly 1,900-acre site and its power path. Groundbreaking was December 2025, with a team of four general contractors and full buildout targeted for 2028.
Deal anatomy

Six layers, and who holds each.

Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.

Power
We Energies (WEC Energy Group), Cloverleaf Infrastructure
Site and build
Whiting-Turner, Weitz, Michels, Turner/McCarthy JV
Compute
Not disclosed
Cloud operator
Oracle
Anchor tenant
Members
Capital
Members
Free for professionals in AI infrastructure.
Timeline

From here to full build.

  1. Oct 2026Today
  2. 2027First powertargeted; We Energies working toward a 1.3 GW grid connection by end of 2027
  3. 2028Full buildout
The detail

Each party's role.

Power

We Energies (WEC Energy Group). Serving utility under a dedicated rate; Vantage underwrites 100% of the power infrastructure. Nearly 2 GW of new generation is being added, 30% dedicated to existing Wisconsin customers

Power

Cloverleaf Infrastructure. Powered-land originator: assembled the ~1,900-acre site (annexed May 2025) and the We Energies power path, then brought in Vantage as developer; remains a co-party in the PSC rate case

Site and build

Whiting-Turner, Weitz, Michels, Turner/McCarthy JV. General contractors: four single-story data centers, ~2.5M sq ft on a 672-acre campus; closed-loop liquid cooling with minimal water use; groundbreaking Dec 2025 reported

Compute

Not disclosed. No compute fleet announced; sibling Stargate sites deploy NVIDIA GPU systems inferred

Cloud operator

Oracle. Expected to operate the cloud capacity serving OpenAI under the Stargate model reported

Related sites

Nearby in the buildout.

Sources

The record behind this page.

Neocloud Group

Who keeps this record.

Neocloud Group is the advisory firm AI companies bring in to secure data center capacity. The Registry is part of that work.

Need capacity in Wisconsin?

Tell us the megawatts and the date. Within one business day, a first read on which operators and sites in Wisconsin can take you. Hold a powered site there yourself? Tell us about it.

Start a conversation →