Vantage Data Centers · Shackelford County, Shackelford County, Texas
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
VoltaGrid. Behind-the-meter on-site natural gas microgrid (INNIO Jenbacher engines) per press reporting citing project documents; the Vantage-VoltaGrid partnership covers 1 GW+ portfolio-wide. ERCOT is the region, the primary supply plan is off-grid reported
Kiewit. General contractor: 10 buildings, 3.7M sq ft on 1,200 acres; groundbreaking Dec 2025; closed-loop chiller design for 250kW+ racks with minimal water use reported
Not disclosed. No compute fleet announced for this campus inferred
Not disclosed. Operating stack not announced; Oracle-led under the Stargate model inferred
Neocloud Group is the advisory firm AI companies bring in to secure data center capacity. The Registry is part of that work.
Tell us the megawatts and the date. Within one business day, a first read on which operators and sites in Texas can take you. Hold a powered site there yourself? Tell us about it.
Start a conversation →