Cipher Mining · Colorado City, Mitchell County, Texas
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
Oncor Electric Delivery (Barber Lake 138 kV substation, ERCOT West). Front-of-meter: 300 MW, energized Sept 2024
Cipher (miner → HPC). Purpose-built, ground-up HPC campus (new build, not a converted mining hall)
Tenant-supplied (undisclosed). Anthropic did not specify; NVIDIA or Google TPU inferred
Fluidstack. Neocloud operator (anchor tenant)
Neocloud Group is the advisory firm AI companies bring in to secure data center capacity. The Registry is part of that work.
Tell us the megawatts and the date. Within one business day, a first read on which operators and sites in Texas can take you. Hold a powered site there yourself? Tell us about it.