Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
Texas-New Mexico Power (TNMP). T&D utility for the campus: 300 MW of gross utility capacity energized, with an incremental ~300 MW confirmed with the utility but allocation timing undetermined
ERCOT. Independent system operator; TNMP's T&D activities are solely within ERCOT, covering far-west Texas between Midland and El Paso. The existing 300 MW is conditionally approved in Batch Zero as Base Load, Pathway (b); a further 300 MW is conditionally approved as Studied Load. Collateral posted; the final allocation and load ramp await the end of Batch Zero
Core Scientific (in-house development). Self-performs siting, design and development, converting a 300 MW bitcoin mining campus into AI data halls; first hall footings set and precast walls arriving as of 2026-04-27. No third-party general contractor is named for the AI build.
AMD Instinct GPUs / EPYC CPUs. Silicon named at partnership level; no filing assigns specific hardware to Pecos inferred
AMD ROCm. Software stack named alongside Instinct and EPYC in the deployment collaboration; not site-specific inferred
Core Scientific. Operates and maintains the campus
Neocloud Group is the advisory firm AI companies bring in to secure data center capacity. The Registry is part of that work.
Tell us the megawatts and the date. Within one business day, a first read on which operators and sites in Texas can take you. Hold a powered site there yourself? Tell us about it.