Crusoe · Abilene, Taylor County, Texas
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
Behind-the-meter on-site power plant. ~900 MW on-site generation + BESS; ERCOT-connected
ERCOT. Interconnected grid region
Closed-loop non-evaporative liquid cooling. Cooling for ultra-high-density compute (greenfield build, no retrofit)
Undisclosed (Microsoft-procured). Vendor undisclosed; NVIDIA or Microsoft Maia inferred
Crusoe. Builds and operates the AI factory campus