Riot Platforms · Rockdale, Milam County, Texas
Every Registry site is read the same way: a campus is real when each layer has a name. Members see the anchor tenant and the capital.
ERCOT / Oncor. 700 MW approved via the Sandow Switch (former Alcoa site); Oncor delivers
Rockdale PPA (Whinstone US). 345 MW fixed-price PPA in three blocks (through 2027-2030)
Riot Platforms (in-house). Retrofit of existing Building G for high-density critical IT, delivered in phases (5 MW Jan 2026, remainder targeted May 2026); in-house data center team, Riot Engineering supplies power-distribution equipment
AMD (anchor tenant). AMD anchor lease; own accelerators (likely Instinct) inferred
AMD. Tenant operates its own compute workloads; Riot provides facility operations under the lease reported
Neocloud Group is the advisory firm AI companies bring in to secure data center capacity. The Registry is part of that work.
Tell us the megawatts and the date. Within one business day, a first read on which operators and sites in Texas can take you. Hold a powered site there yourself? Tell us about it.